Training, Evaluation, and Deployment
Run finetuning experiments safely: hyperparameters, eval gates, rollout strategy, and rollback design.
Minimal training plan
Start with a small, controlled run before scaling:
- Train split: 80%
- Validation split: 10%
- Test split: 10%
- 3-5 hyperparameter variants max
Track both training and validation loss. If training drops while validation worsens, stop and regularize.
Evaluation gate before release
Pass all gates before deployment:
- Task quality improves versus baseline.
- No regression on core safety suite.
- Structured output validity stays above target.
- Cost and latency remain inside budget.
Rollout strategy
Use progressive exposure:
- Internal dogfood.
- 5% traffic shadow or canary.
- 25% with active monitoring.
- 100% after stability window.
Rollback readiness
Always keep:
- Previous model checkpoint ready.
- One-command rollback path.
- Alert thresholds for error spikes and refusal drift.
If (quality drops OR policy violations rise OR latency spikes) -> auto rollback
What great teams do differently
They treat finetuning as a product loop, not a one-time training event:
- Collect failure data continuously.
- Patch dataset monthly.
- Re-run eval suites on every model update.
- Ship improvements in small, measurable iterations.